Digist
Home
EN
中文
日本語
Sign in
Sign up
Detail
US grid operator suspends data center power auction as electric demand from AI infrastructure surges
Original
· Smithwire · 18d ago
PJM Interconnection halts planned auction; reflects broader grid capacity constraints amid AI buildout.
Original
Please improve
Tap what is wrong. A note is optional.
Translation is wrong
Garbled text
Wrong tags
Not about this topic
Submit
Close